Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorDelice, Yilmaz
dc.contributor.authorAydogan, Emel Kizilkaya
dc.contributor.authorSoylemez, Ismet
dc.contributor.authorOzcan, Ugur
dc.date.accessioned2021-04-26T07:01:56Z
dc.date.available2021-04-26T07:01:56Z
dc.date.issued2018en_US
dc.identifier.issn0256-2499
dc.identifier.issn0973-7677
dc.identifier.urihttp //doi. org/10.1007/s12046-018-0969-9
dc.identifier.urihttps://hdl.handle.net/20.500.12573/676
dc.descriptionThis research was supported by Scientific Research Fund of Erciyes University under the contract no: FBA-2017-7349.en_US
dc.description.abstractSome practical arrangements in assembly lines necessitate set-up times between consecutive tasks. To create more realistic models of operations, set-up times must be considered. In this study, a sequence-dependent set-up times approach for two-sided u-type assembly line (TUAL) structures is proposed for the first time. Previous studies on TUAL have not included set-up times in their analyses. Furthermore, an algorithm based on the Ant Colony Optimization (ACO) algorithm, which is using a heuristic priority rule based procedure has been proposed in order to solve this new approach. In this paper, we look at the sequence-dependent set-up times between consecutive tasks and consecutive cycles, called the "forward set-up time'' and the "backward set-up time'', respectively. Additionally, we examine the "crossover set-up time'', which arises from a new sequence of tasks in a crossover station. In order to model more realistic assembly line configurations, it is necessary to include sequence-dependent set-up times when computing all of the operational times such as task starting times and finishing times as well as the total workstation time. In this study, the proposed approach aims to minimize the number of mated-stations as the primary objective and to minimize the number of total workstations as a secondary objective. In order to evaluate the efficiency of the proposed algorithm, a computational study is performed. As can be seen from the experimental results the proposed approach finds promising results for all literature-test problems.en_US
dc.description.sponsorshipErciyes University FBA-2017-7349en_US
dc.language.isoengen_US
dc.publisherSPRINGER INDIA, 7TH FLOOR, VIJAYA BUILDING, 17, BARAKHAMBA ROAD, NEW DELHI, 110 001, INDIAen_US
dc.relation.isversionof10.1007/s12046-018-0969-9en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectpriority rulesen_US
dc.subjectant colony optimizationen_US
dc.subjectsequence-dependent set-up timesen_US
dc.subjectAssembly line balancingen_US
dc.subjectU-type assembly linesen_US
dc.subjecttwo-sided assembly linesen_US
dc.titleAn ant colony optimisation algorithm for balancing two-sided U-type assembly lines with sequence-dependent set-up timesen_US
dc.typearticleen_US
dc.contributor.departmentAGÜ, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.contributor.authorID0000-0002-4654-0526en_US
dc.contributor.authorID0000-0002-8253-9389en_US
dc.identifier.volumeVolume: 43en_US
dc.identifier.issue12en_US
dc.relation.journalSADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCESen_US
dc.relation.publicationcategoryMakale - Uluslararası - Editör Denetimli Dergien_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster